Building a Bridge

Temporary Shoring & Jacking Plans

Hydraulic jacking system used in overpass repair by Alim Engineers

IH 635 Rehabilitation

Delivered the jacking plan for bearing replacement on the IH 635 Rehabilitation Project—a key step in strengthening one of Texas’s busiest corridors.

Maple Avenue Knight Street Overpass Span 4

Developed a precision jacking plan to facilitate a repair on a fractured critical bridge member — an essential measure to restore structural integrity and ensure safe load transfer during the reinforcement of a high-risk bridge segment.

Structural engineers inspecting temporary shoring for bridge rehabilitation
Bridge construction showing temporary shoring installed by Alim Engineers in Houston, Texas

IH 345 Rehabilitation Ramp N

Developed a comprehensive jacking plan for Connectors C & D, ensuring safe load transfer and structural stability during scheduled maintenance operations. The plan supported temporary lifting of critical bridge segments to allow for targeted repairs, reinforcing the structural performance of a key transportation link.